INSP-Final Inspection | 4/11/2019 | 4/12/2019 | 4/12/2019 | A | PASS |
Jim Page
|
|
|
Final inspection for underground supply complete.
JEremy Phone #: ###-####
|
INSP-Sprinkler Rough-in/Hydro | 4/12/2019 | 4/12/2019 | 4/12/2019 | A | DONE |
Jim Page
|
|
|
Hydrostatic test for undergorund supply witnessed, no pressure loss observed.
|
INSP-Supply line flush | 4/11/2019 | 4/12/2019 | 4/12/2019 | A | DONE |
Jim Page
|
|
|
Underground main line flush complete.
JEremy Phone #: ###-####
|
INSP-Sprinkler Rough-in | 6/21/2018 | 6/21/2018 | 6/21/2018 | P | PASS |
Jim Page
|
|
|
Rough to cover inspection for underground supply complete, approved for cover.
Jeremy Phone #: ###-####
|