Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberFIR18-00409
StatusFinaled
Name ABSOLUTE FIRE PROTECTION
Site Address 350 N 9TH ST Unit: 301
Project NameBCI TI
Customer Number 
ePlanReviewYes
Description
[BCI] - Quick Permit
Relocate 1 SSP, Add 3 SSP, relocate 2 SSU and add 9 SSU for new full height walls. Light Hazard office

[BLD18-00456]
(BCI / BCI foundation Ste #301) Permit is to remodel an existing 4,280 sq. ft. business space. Approval is contingent upon adhering to the approved plans on file. Work to include: removal of select interior nonbearing walls, removal of select door/door frame, removal of select millwork, new construction of select interior non-bearing walls to create small conference rooms, office areas, break room, relocated light fixtures, electrical work and interior finishes in compliance with Ch. 8 of the 2012 IBC. This building is fully Fire Sprinklered. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. RmH
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection6/7/20186/13/20186/13/2018APASS
DetailsJim Page
Rough to cover inspection for overhead fire sprinkler piping in area of work complete, approved for cover.

Phone #: ###-#### Inspection requested via web by Sam Ball
INSP-Sprinkler Rough-in6/5/20186/5/20186/5/2018PPASS
DetailsJim Page
Rough to cover inspection for overhead fire sprinkler piping in area of work complete, approved for cover.

Phone #: ###-#### Inspection requested via web by Sam Ball