INSP-Final Inspection | 6/11/2018 | 6/12/2018 | 6/12/2018 | A | PASS |
Jim Page
|
|
|
Final commercial hood fire suppression system inspection complete.
Dave Phone #: ###-####
|
INSP-Sprinkler Rough-in/Hydro | 6/11/2018 | 6/12/2018 | 6/12/2018 | A | CANC |
Jim Page
|
|
|
Coordinated for 7AM with installing contractor.
|
INSP-Final Inspection | 6/11/2018 | 6/11/2018 | 6/11/2018 | P | CANC |
Jim Page
|
|
|
Inspection request rescheduled per conversation with point of contact.
Dave Phone #: ###-####
|