DOC - Permit Finaled | | | 9/12/2018 | | DONE |
|
|
|
per passing inspection by LGM 9/11/18
|
INSP-Alarm Testing | 9/11/2018 | 9/11/2018 | 9/11/2018 | A | PASS |
Lee G Meredith
|
|
|
|
INSP-Final Inspection | 9/10/2018 | 9/11/2018 | 9/11/2018 | A | DONE |
Troy Cobbley
|
|
|
Contact is Sean. Phone #: ###-#### >> Inspection requested via web by Morgan Ahten
|
DOC - Permit Finaled | | | 9/10/2018 | | DONE |
|
|
|
System passed inspection all required documents provided.
|
INSP-Conference | 7/5/2018 | 7/5/2018 | 7/5/2018 | P | DONE |
Troy Cobbley
|
|
|
It appears that a plan modification will be required due to the changes made.
|