INSP-Final Inspection | 12/17/2018 | 12/18/2018 | 12/18/2018 | A | PASS |
Jim Page
|
|
|
Final fire sprinkler inspection for area of work complete.
The General Contractor informed us they were attempting to complete their Fire Life Safety for the BLD at 7 AM Tuesday 12-18. We would like to perform our inspection in conjunction. Please let Tom know if there are any questions. Phone #: ###-#### Inspection requested via web by Jeff Packham
|
INSP-Sprinkler Rough-in | 12/11/2018 | 12/11/2018 | 12/11/2018 | P | PASS |
Jim Page
|
|
|
Rough to cover inspection for overhead fire sprinkler piping in area of work complete, approved for cover.
Call to meet there // Tom Phone #: ###-####
|
INSP-Sprinkler Rough-in | 10/31/2018 | 11/1/2018 | 11/1/2018 | A | PASS |
Jim Page
|
|
|
Rough to cover inspection for overhead fire sprinkler piping in area of work complete, approved for cover.
Coordinate inspection with Tom Small Phone #: ###-#### Inspection requested via web by Christophe Wilson
|