Information based on query as of Tuesday, July 23, 2024.
Permit Information
Permit NumberFIR18-00525
StatusFinaled
Name SHILO AUTOMATIC SPRINKLER CO
Site Address 9492 W EMERALD ST
Project NameSalvation Army HQ
Customer Number 
ePlanReviewYes
Description
[Salvation Army HQ]
The fire sprinkler scope of work consists of protecting a two level building. The bottom level is larger than the top level. The building is primarily a school. Install a new 6" c900 UG to a 2 story combustible construction building. The UG will connect to a 4" backflow which feeds two 4" riser manifolds. The FDC will be run to the front of the building at an accessible place. All steel pipe shall be used. Open to structure areas will have brass uprights. Conference rooms and entry locations shall have concealed heads. All other heads shall be chrome semi-recessed. Most rooms shall be light hazard. Some rooms shall be ordinary group II depending on combustibles.

• The underground piping is under permit FIR18-00375.

[BLD18-04447]
Permit for a new 36-foot-tall, 31,828 sq.ft., 2 story building of type V-B construction. This facility will include a chapel/auditorium, classrooms, day care and offices. This building is required to be fully fire sprinklered and includes a fire alarm system. Separate fire sprinkler and fire alarm permits will be required for the required fire protection systems; as regulated by the Fire Department. CDM/SJA

Alternative Materials and Methods:
This project includes approved code alternates to the following fire protection systems and/or building life safety systems. Please review the supplemental documents attached to this building permit case for details. Fire protection “shop drawings” shall include approved code alternate design.

• There are no AMM at this time.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection9/10/20199/12/20199/12/2019PPASS
DetailsJim Page
Final fire sprinkler inspection is complete.

Todd Ketterling is the contact. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Sprinkler Rough-in8/29/20198/30/20198/30/2019APASS
DetailsTroy Cobbley
Rough-in is for the west area and clouds passed. Piping can be covered.. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Final Inspection8/28/20198/29/20198/29/2019AFAIL
DetailsTroy Cobbley
Not ready for a final yet. Inspection was actually a walk through for the completed areas. The work in the finished areas has been completed. I noted one missing sprinkler canopy. Need rough to coover for the remaining west end first floor. Jon Beazer is the contact. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Sprinkler Rough-in/Hydro7/16/20197/17/20197/17/2019PPASS
DetailsTroy Cobbley
Overhead hydro test for both systems passed.

Cole Bierman is the contact for this overhead hydro. He is requesting it for the 1st and 2nd floors. Thank you for your help. Have a nice day. Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Sprinkler Rough-in7/2/20197/3/20197/3/2019APASS
DetailsTroy Cobbley
See the city approved plans for the first floor areas marked "ok" where piping is ok for cover.
INSP-Sprinkler Rough-in7/1/20197/2/20197/2/2019PPASS
DetailsTroy Cobbley
The second floor piping rough-in is complete. Piping can be covered. Piping for the clouds in the entry lobby not complete.

Todd Ketterling is the contact for this RTC inspection, he is requesting it on the 2nd floor. He is hoping for and early PM appointment. Thank you for your help and time. Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Sprinkler Rough-in6/12/20196/13/20196/13/2019APASS
DetailsTroy Cobbley
See the city approved plans for additional areas where piping above the hardlids, on the first floor, is ok for cover.

Jon Beazer is the contact. He wants this to be a rough-in for the first floor. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Sprinkler Rough-in5/1/20195/2/20195/2/2019PPASS
DetailsTroy Cobbley
The piping above the hardlids in the first floor southwest restrooms and Corridor/Entry Lobby is ok to cover. Todd Ketterling is the contact. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Sprinkler Rough-in5/1/20195/2/20195/1/2019ACANC
DetailsTroy Cobbley
Todd Ketterling is the contact. Thank you for your hard work! Phone #: ###-#### >> Inspection requested via web by Stan Beus Inspection cancelled from web by: Stan Beus
INSP-Sprinkler Rough-in4/19/20194/22/20194/22/2019APASS
DetailsTroy Cobbley
Rough-in complete for first and second floors. See plans fro minor corrections needed that will be verified at next inspection. Plan mods are required for changes. Todd Ketterling is the contact. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Sprinkler Rough-in4/17/20194/19/20194/19/2019PCANC
DetailsJim Page
Per conversation with point of contact, inspection will be rescheduled for 22APR2019, this request is cancelled.

Todd Ketterling is the contact. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Sprinkler Rough-in4/11/20194/12/20194/12/2019APART
DetailsTroy Cobbley
First floor rough-in complete. Second floor rough-in is partial due to time constraints. See the city approved plans for corrections needed. Plan mods may be required due to the additional fittings in many of the branchlines/mains.


Todd Ketterling is the contact. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Sprinkler Rough-in4/9/20194/10/20194/10/2019APASS
DetailsTroy Cobbley
Second floor piping is ok for cover above the soffits/hardlids.

Todd Ketterling is the contact. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Sprinkler Rough-in3/18/20193/19/20193/19/2019APASS
DetailsTroy Cobbley
See the city approved plans for locations where piping can be covered above hardlids.

Jordan Fuger is the contact. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Sprinkler Rough-in2/18/20192/19/20192/19/2019APASS
DetailsTroy Cobbley
See the city approved plans for hardlid areas marked "ok" for cover.


The contact is Jordan Fuger. Thank you! Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Sprinkler Rough-in/Hydro1/14/20191/15/20191/15/2019PPASS
DetailsTroy Cobbley
Underground hydro test passed