INSP-Final Inspection | 11/1/2018 | 11/1/2018 | 11/1/2018 | A | PASS |
Jim Page
|
|
|
Final underground supply inspection complete
|
INSP-Supply line flush | 10/31/2018 | 11/1/2018 | 11/1/2018 | A | DONE |
Jim Page
|
|
|
Main line flush complete.
6am // Mike Phone #: ###-####
|
INSP-Supply line flush | 10/29/2018 | 11/1/2018 | 11/1/2018 | A | DONE |
Jim Page
|
|
|
Underground main line flush complete.
Per Jim Page after hour inspection
|
INSP-Sprinkler Rough-in/Hydro | 10/23/2018 | 10/24/2018 | 10/24/2018 | A | DONE |
Jim Page
|
|
|
Hydro for undergorund supply witnessed, no pressure loss observd at provided gauge.
Hydro- Troy Phone #: ###-####
|
INSP-Sprinkler Rough-in | 8/28/2018 | 8/29/2018 | 8/29/2018 | A | PASS |
Troy Cobbley
|
|
|
The remaining underground piping is ok for cover.
Please coordinate Inspection for late am with Troy Nelson Phone #: ###-#### Inspection requested via web by Christophe Wilson
|
INSP-Sprinkler Rough-in | 7/10/2018 | 7/10/2018 | 7/10/2018 | P | PART |
Jim Page
|
|
|
Rough to cover inspection for IBR complete, IBR approved for cover, remaining underground to be inspected at a later date.
fire service stub out cover inspection. Coordinate with Rick Fry Phone #: ###-#### Inspection requested via web by Christophe Wilson
|