INSP-Final Inspection | 5/13/2019 | 5/14/2019 | 5/14/2019 | P | PASS |
Jim Page
|
|
|
Final fire sprinkler inspection complete.
sprinkler final - prefer after 1pm // Rick Phone #: ###-####
|
INSP-Sprinkler Rough-in | 3/26/2019 | 3/26/2019 | 3/26/2019 | P | PASS |
Jim Page
|
|
|
Rough to cover inspection for overehad fire sprinkler in hallway next to gym complete, approved for cover.
Curt Phone #: ###-####
|
INSP-Final Inspection | 3/21/2019 | 3/22/2019 | 3/22/2019 | A | PART |
Jim Page
|
|
|
Fire sprinkler inspection for phase 1 TCO complete.
Rick Phone #: ###-####
|
INSP-Sprinkler Rough-in/Hydro | 3/13/2019 | 3/14/2019 | 3/14/2019 | A | DONE |
Jim Page
|
|
|
Hydrostatic test for overhead fire sprinkler piping witnessed, no pressure loss observed.
Tom Phone #: ###-####
|
INSP-Sprinkler Rough-in | 3/11/2019 | 3/11/2019 | 3/11/2019 | P | PART |
Jim Page
|
|
|
Rough to cover inspection for overhead fire sprinkler piping above drop ceiling in kitchen area and cafeteria complete, notated city approved drawings with red ink areas approved for cover.
Roy Phone #: ###-####
|
INSP-Sprinkler Rough-in | 2/13/2019 | 2/14/2019 | 2/14/2019 | A | PART |
Jim Page
|
|
|
Rough to cover inspection for overhead fire sprinkler piping above hardlids complete, notated city approved drawings with red ink areas approved for cover.
Rick Phone #: ###-####
|
INSP-Sprinkler Rough-in | 1/15/2019 | 1/16/2019 | 1/16/2019 | A | PART |
Jim Page
|
|
|
Rough to cover inspection for overhead fire sprinkler piping above hardlids in locker room areas complete, notated city approved drawings with red ink areas appropved for cover.
Kurt Phone #: ###-####
|
INSP-Sprinkler Rough-in | 12/17/2018 | 12/17/2018 | 12/17/2018 | P | PART |
Jim Page
|
|
|
Rough in inspection for overhead fire sprinkler piping complete, areas where pendant heads are to be installed will require a cover inspection before cover can be approved.
Rudy Phone #: ###-####
|