INSP-Final Inspection | 5/10/2019 | 5/13/2019 | 5/13/2019 | P | PASS |
Jim Page
|
|
|
Final fire sprinkler inspection complete.
Johnathon Phone #: ###-####
|
INSP-Sprinkler Rough-in/Hydro | 3/29/2019 | 4/1/2019 | 4/1/2019 | A | DONE |
Jim Page
|
|
|
Hydrostatic test for overhead fire sprinkler piping witnessed, no pressure loss observed, hydrostatic testing for this building is complete.
overhead // Jonathan Phone #: ###-####
|
INSP-Sprinkler Rough-in | 3/26/2019 | 3/29/2019 | 3/29/2019 | P | PASS |
Jim Page
|
|
|
Tenting/insulation inspection for fire sprinklers in remaining units complete, approved for cover. Rough to ocver ispection complete for all units in this building.
insulation inspection for units 128, 130, and 132 // Jonathan Phone #: ###-####
|
INSP-Sprinkler Rough-in | 3/18/2019 | 3/19/2019 | 3/19/2019 | A | PART |
Jim Page
|
|
|
Tenting inspection for units 112, 114, 116, 118 and 120 complete, piping is approved for cover.
overhead- Verfiy insullation in units 114, 116, 118 and 120- John. Phone #: ###-####
|
INSP-Sprinkler Rough-in/Hydro | 3/13/2019 | 3/14/2019 | 3/14/2019 | A | DONE |
Jim Page
|
|
|
Hydrostatic test for overhead fire sprinkler piping witnessed, no pressure loss observed.
Johnathon Phone #: ###-####
|
INSP-Supply line flush | 3/8/2019 | 3/11/2019 | 3/11/2019 | P | DONE |
Jim Page
|
|
|
Underground main line flush complete.
Jonathan Phone #: ###-####
|
INSP-Sprinkler Rough-in | 2/1/2019 | 2/1/2019 | 2/1/2019 | P | CANC |
Troy Cobbley
|
|
|
No city approved plans on site. No inspection. Johnathon Phone #: ###-####
|
INSP-Sprinkler Rough-in | 1/2/2019 | 1/3/2019 | 1/3/2019 | A | PASS |
Jim Page
|
|
|
Rough to cover inspection for overhead fire sprinkler piping/insulation for remaining building complete, approved for cover.
John Phone #: ###-####
|
INSP-Sprinkler Rough-in | 12/11/2018 | 12/12/2018 | 12/12/2018 | A | PART |
Jim Page
|
|
|
Rough to cover inspection for overhead fire sprinkler piping/insulation for unti 119 complete, approved for cover.
Nate Phone #: ###-####
|
INSP-Sprinkler Rough-in | 12/7/2018 | 12/10/2018 | 12/10/2018 | P | PART |
Jim Page
|
|
|
Rough to cover inspection for units, 111, 113, 115 and 117 complete, approved for cover.
Johnathon Phone #: ###-####
|
INSP-Sprinkler Rough-in | 11/28/2018 | 11/29/2018 | 11/29/2018 | A | PART |
Jim Page
|
|
|
Previously noted items have been corrected, rough to cover inspection complete for overhead fire sprinkler piping in west building, units 101, 105, 107, 109, 201 and 203. Inspected units approved for cover.
John Phone #: ###-####
|
INSP-Sprinkler Rough-in | 11/26/2018 | 11/27/2018 | 11/27/2018 | P | FAIL |
Jim Page
|
|
|
Correct overspaced attic heads as discussed. Insulation needs to be pulled tight and not hanging below deflectors is attic spaces. Make corrections to heads that are to close to deck, heads need to be 1 inch to 3 inches below the top cord per manufacture specs. Combustible concealed space under stairs that do not have insulation will need to have fire sprinkler protection added or cobustible material is covered with sheetrock or fill the space with non-combustible insulation.
Jonathon Phone #: ###-####
|
INSP-Sprinkler Rough-in | 10/24/2018 | 10/24/2018 | 10/24/2018 | P | DONE |
Jim Page
|
|
|
Hydrostatic test for both underground mains witnessed, no pressure loss observed.
Johnathon-hydro underground east and west bldg Phone #: ###-####
|
INSP-Sprinkler Rough-in | 10/16/2018 | 10/16/2018 | 10/16/2018 | P | PASS |
Jim Page
|
|
|
Rough to cover inspection for underground supply complete, approved for cover
Supply line cover-Jon Phone #: ###-####
|
INSP-Sprinkler Rough-in | 10/4/2018 | 10/4/2018 | 10/4/2018 | P | PASS |
Jim Page
|
|
|
Rough to cover inspection for underground supply complete, approved for cover.
underground cover-John Phone #: ###-####
|