Permit Information
Permit NumberFIR18-00586
StatusFinaled
Name TREASURE VALLEY FIRE PROTECTION
Site Address 3107 N COLE RD
Project NameASIAN FOOD DISTRIBUTION TI
Customer Number 
ePlanReviewYes
Description
[Idaho Capital Asian Market] - Quick Permit
ADD OR RELOCATE SSU AND SSP SPRINKLERS OFF OF EXISTING LINES OR MAINS THROUGHOUT THE AREA OF WORK PER NFPA 13 2016 FOR LIGHT AND ORDINARY HAZARD. SSP SPRINKLERS IN THE MARKET AREA WILL BE REMOVED AND PLUGGED DUE TO REMOVAL OF CEILING. UPRIGHT PROTECTION IN THIS AREA TO REMAIN IN PLACE.

[BLD18-01505]
Permit is to remodel an existing 14,984 sq. ft. retail tenant space for a grocery market use. Approval is contingent upon adhering to the approved plans on file and attached engineering. Work to include: removal of select interior nonbearing walls, removal of select door/door frames, removal and relocation of Hi/Lo drinking fountain, removal of select suspended acoustic ceiling, removal of approximately 411 sq. ft. interior concrete slab, construction of select interior non-bearing walls to create a meat processing room and a telephone room, select wall infill, select door/door frames, new plumbing fixtures, new walk-in cooler, new walk-in freezer, new refrigerated cases, new rooftop condensing units with structural modification to select existing roof joist for support of new rooftop condensing units see attached engineering, select new exterior entry storefront, select new rear exterior concrete ramp, new light fixtures, electrical work, plumbing work, mechanical work and interior finishes in compliance with Ch. 8 of the current IBC. This building is fully Fire Sprinklered. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **JG**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection10/24/201810/24/201810/24/2018PPASS
DetailsTroy Cobbley
Permit finaled


Terry Phone #: ###-#### Inspection requested via web by Nathan Stenquist
INSP-Sprinkler Rough-in10/8/201810/8/201810/8/2018PPASS
DetailsJim Page
Rough to cover inspection for area of work complete.

Rick Phone #: ###-####
INSP-Sprinkler Rough-in9/26/20189/26/20189/26/2018PPART
DetailsTroy Cobbley
Rough-in looks ok but piping can not be covered until the tape is taken off of the existing upright heads. Need another inspection to verify this.

RICK FRY Phone #: ###-#### Inspection requested via web by Nathan Stenquist