INSP-Final Inspection | 6/4/2019 | 6/4/2019 | 6/4/2019 | A | PASS |
Jim Page
|
|
|
Final fire sprinkler inspection complete.
Corcinate final with Mike Oswald Phone #: ###-#### Inspection requested via web by Christophe Wilson
|
INSP-Sprinkler Rough-in | 5/13/2019 | 5/13/2019 | 5/13/2019 | P | PART |
Jim Page
|
|
|
Rough to cover inspection for overhead fire sprinkler piping in common corridors and elevator lobby on levels 3 and 4 complete, approved for cover.
Mike Phone #: ###-####
|
INSP-Sprinkler Rough-in/Hydro | 4/30/2019 | 5/1/2019 | 5/1/2019 | A | PASS |
Troy Cobbley
|
|
|
The overhead hydro tests on all systems have been witnessed with no loss at the guage. Mike Phone #: ###-####
|
INSP-Sprinkler Rough-in/Hydro | 4/24/2019 | 4/24/2019 | 4/24/2019 | P | PART |
Jim Page
|
|
|
Rough to cover inspection for overhead fire sprinkler piping above suspended ceilings in elevator lobbies on levels 1 and 2 complete, levels 1 and 2 elevator lobbies approved for cover.
Mike Phone #: ###-####
|
INSP-Sprinkler Rough-in | 3/5/2019 | 3/6/2019 | 3/6/2019 | A | PART |
Jim Page
|
|
|
Rough to cover inspection for level 5 restrooms and elevator lobby complete, approved for cover.
Mike-5th floor Phone #: ###-####
|
INSP-Sprinkler Rough-in | 2/26/2019 | 2/27/2019 | 2/27/2019 | A | PART |
Jim Page
|
|
|
Rough to cover inspection for overhead fire sprinkler piping on level 1 stairwell landings complete, approved for cover.
Cover inpection for first floor stairways only Cordinate with Mike Oswald ###-#### Phone #: ###-#### Inspection requested via web by Christophe Wilson
|
INSP-Sprinkler Rough-in | 2/18/2019 | 2/19/2019 | 2/19/2019 | A | PART |
Jim Page
|
|
|
Overehad fire sprinkler piping in elevator lobby hardlids for levels 2, 3 and 4 complete, approved for cover. Sprinkler piping providing water to elevator shaft sprinkler heads on level 5 complete as well. Please Cordinate Inspection with Mike Oswald Phone #: ###-#### Inspection requested via web by Christophe Wilson
|
INSP-Sprinkler Rough-in | 2/4/2019 | 2/4/2019 | 2/4/2019 | P | PART |
Jim Page
|
|
|
Rough to cover inspection for overhead fire sprinkler piping located above the hardlids in restrooms on level 3 complete, level 3 restrooms approved for cover.
Rough to cover third floor Phone #: ###-#### Inspection requested via web by Christophe Wilson
|
INSP-Sprinkler Rough-in | 1/29/2019 | 1/29/2019 | 1/29/2019 | P | PART |
Jim Page
|
|
|
Overhead fire sprinkler piping located above hardlids in level 2 restrooms and level 1 entry hardlids complete, areas inspected approved for cover.
Second floor restrooms rough to cover // Mike Phone #: ###-####
|
INSP-Sprinkler Rough-in/Hydro | 1/14/2019 | 1/14/2019 | 1/14/2019 | P | PART |
Jim Page
|
|
|
Rough to cover inspection for overhead fire sprinkler piping located above hardlids on level 1 complete, level 1 hardlids approved for cover.
Mike Phone #: ###-####
|
INSP-Conference | 12/5/2018 | 12/5/2018 | 12/5/2018 | A | DONE |
Jim Page
|
|
|
Access and exit to riser room is acceptable as long as the largest piece of equipment in the room can be removed without obstruction.
|
INSP-Sprinkler Rough-in | 12/4/2018 | 12/5/2018 | 12/5/2018 | A | CANC |
Jim Page
|
|
|
Mike Phone #: ###-####
|
INSP-Conference | 10/26/2018 | 10/26/2018 | 10/26/2018 | P | DONE |
Jim Page
|
|
|
Temporary FDC is installed on the southside of building.
Temp FDC is Installed Phone #: ###-#### Inspection requested via web by Christophe Wilson
|
INSP-Conference | 10/1/2018 | 10/1/2018 | 10/1/2018 | P | DONE |
Jim Page
|
|
|
Fire conference complete, soil was re-sampled and designated as Class B soil, sway bracing is not required with Class B soil. Contractor will submit plan mod for sway bracing being deleted.
MIke Phone #: ###-####
|
INSP-Sprinkler Rough-in | 9/4/2018 | 9/4/2018 | 9/4/2018 | P | PART |
Jim Page
|
|
|
Inspection for beam clamps/retaining straps and eartquake sway bracing attachments inspected on level 1 before fire proofing complete, all installed correctly, points of attachment approved for cover, overhead fire sprinkler piping to be inspected at a later date.
MIke Phone #: ###-####
|