INSP-Final Inspection | 4/12/2019 | 4/15/2019 | 4/15/2019 | A | PASS |
Jim Page
|
|
|
Final fire sprinkler inspection complete, irrigation system not installed at time of this inspection but wire for solenoid disconnect on water flow has been installed from flow switch to sprinkler timer.
Colton Cox is the contact for this Hydro and he wants a Final Inspection. Thank you for your help. Have a nice day. Phone #: ###-#### Inspection requested via web by Stan Beus
|
INSP-Sprinkler Rough-in/Hydro | 4/12/2019 | 4/15/2019 | 4/15/2019 | A | DONE |
Jim Page
|
|
|
Hydrostatic test for overhead fire sprinkler piping witnessed at city static pressure, no pressure loss observed.
Colton Cox is the contact for this Hydro and he want a Final Inspection. Thank you for your help. Have a nice day. Phone #: ###-#### Inspection requested via web by Stan Beus
|
INSP-Final Inspection | 4/11/2019 | 4/12/2019 | 4/12/2019 | A | FAIL |
Jim Page
|
|
|
Hydrostatic test for overhead fire sprinkler needs to be completed per section 11.2 of NFPA 13D 2016 edition, no hydro request has been made as of these notes.
Robert Chambers is the contact. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
|
INSP-Final Inspection | 3/20/2019 | 3/26/2019 | 3/26/2019 | P | CANC |
Jim Page
|
|
|
Cancelled per conversation with point of contact, will be rescheduled for a later date.
Colton Cox is the contact. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
|
INSP-Sprinkler Rough-in | 9/14/2018 | 9/17/2018 | 9/18/2018 | P | PASS |
Troy Cobbley
|
|
|
Phone #: ###-#### >> Inspection requested via web by Stan Beus
Rough in ok. Insulation compatibility with CPVC to be verified.
_____________
Compatibility is verified. See attached document. 9/18/2018 TRF
|
INSP-Sprinkler Rough-in | 9/14/2018 | 9/17/2018 | 9/14/2018 | A | CANC |
Troy Cobbley
|
|
|
Phone #: ###-#### >> Inspection requested via web by Stan Beus Inspection cancelled from web by: Stan Beus
|
INSP-Sprinkler Rough-in | 8/28/2018 | 8/29/2018 | 8/29/2018 | P | FAIL |
Troy Cobbley
|
|
|
Plans need to be resubmitted showing the revised pipe routing, additional fittings and elevation changes so that a rough-in can be performed and the hydraulic calculations can be verified. Also inthe Batrooms the sprinkler pendants have been installed to where they no longer provide coverage into the shower areas. No sprinkler piping to be covered.
Phone #: ###-#### Inspection requested via web by Stan Beus
|