Information based on query as of Sunday, June 23, 2024.
Permit Information
Permit NumberFIR18-00632
StatusFinaled
Name SHILO AUTOMATIC SPRINKLER CO
Site Address 1401 S COLOMA PL
Project NameBrourman Residence
Customer Number 
ePlanReviewYes
Description
[Borurman Residence]
The fire sprinkler scope of work consists of a new single family two level home. The system is designed as a passive purge system. The system utilizes CPVC piping and residential type sprinklers.

[BLD18-00388]
Permit for the construction of a new 5426 sq. ft., two story (first story 4603 sq. ft., second story 823 sq. ft.) single family dwelling with 6 bedrooms, 6 bathrooms, approximately 850 sq. ft. of covered patio/porch and a 1630 sq. ft. attached garage per the approved plans, plan review report and any notations. Prescriptive Energy Compliance. W.U.I. Foothills Lot, Class "A" Roof required. Structure to be fully sprinklered. Zoning and setbacks per planning.

Alternative Materials and Methods:
This project includes approved code alternates to the following fire protection systems and/or building life safety systems. Please review the supplemental documents attached to this building permit case for details. Fire protection “shop drawings” shall include approved code alternate design.

• There are no AMM at this time
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection4/12/20194/15/20194/15/2019APASS
DetailsJim Page
Final fire sprinkler inspection complete, irrigation system not installed at time of this inspection but wire for solenoid disconnect on water flow has been installed from flow switch to sprinkler timer.

Colton Cox is the contact for this Hydro and he wants a Final Inspection. Thank you for your help. Have a nice day. Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Sprinkler Rough-in/Hydro4/12/20194/15/20194/15/2019ADONE
DetailsJim Page
Hydrostatic test for overhead fire sprinkler piping witnessed at city static pressure, no pressure loss observed.

Colton Cox is the contact for this Hydro and he want a Final Inspection. Thank you for your help. Have a nice day. Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Final Inspection4/11/20194/12/20194/12/2019AFAIL
DetailsJim Page
Hydrostatic test for overhead fire sprinkler needs to be completed per section 11.2 of NFPA 13D 2016 edition, no hydro request has been made as of these notes.

Robert Chambers is the contact. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Final Inspection3/20/20193/26/20193/26/2019PCANC
DetailsJim Page
Cancelled per conversation with point of contact, will be rescheduled for a later date.

Colton Cox is the contact. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Sprinkler Rough-in9/14/20189/17/20189/18/2018PPASS
DetailsTroy Cobbley
Phone #: ###-#### >> Inspection requested via web by Stan Beus
Rough in ok. Insulation compatibility with CPVC to be verified.

_____________
Compatibility is verified. See attached document. 9/18/2018 TRF
INSP-Sprinkler Rough-in9/14/20189/17/20189/14/2018ACANC
DetailsTroy Cobbley
Phone #: ###-#### >> Inspection requested via web by Stan Beus Inspection cancelled from web by: Stan Beus
INSP-Sprinkler Rough-in8/28/20188/29/20188/29/2018PFAIL
DetailsTroy Cobbley
Plans need to be resubmitted showing the revised pipe routing, additional fittings and elevation changes so that a rough-in can be performed and the hydraulic calculations can be verified. Also inthe Batrooms the sprinkler pendants have been installed to where they no longer provide coverage into the shower areas. No sprinkler piping to be covered.

Phone #: ###-#### Inspection requested via web by Stan Beus