INSP-Final Inspection | 9/24/2018 | 9/26/2018 | 9/26/2018 | A | PASS |
Jim Page
|
|
|
Final fire alarm inspection for area of work complete.
Rafe Phone #: ###-####
|
INSP-Final Inspection | 9/24/2018 | 9/25/2018 | 9/25/2018 | A | CANC |
Jim Page
|
|
|
Request scheduled for the wrong date, this request is cancelled and the correct date for the inspection request has already been generated.
7am-rafe Phone #: ###-####
|
INSP-Conference | 8/27/2018 | 8/27/2018 | 8/27/2018 | P | DONE |
Jim Page
|
|
|
Fire conference complete.
Rafe Phone #: ###-####
|