INSP-Final Inspection | 10/29/2018 | 10/30/2018 | 10/30/2018 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled
Phone #: ###-####
|
INSP-Sprinkler Rough-in/Hydro | 9/21/2018 | 9/24/2018 | 9/25/2018 | P | FAIL |
Troy Cobbley
|
|
|
A manomintor test needs to be performed to verify the correct air flow is being provided due to the od mounting positiond of the detectors and sample tubes. The primary sample tube is also too short.
come in off of meadow dr // Stan Phone #: ###-####
|