INSP-Final Inspection | 1/8/2019 | 1/9/2019 | 1/9/2019 | A | PASS |
Jim Page
|
|
|
Previously noted items have been corrected, fire sprinkler inspection for core and shell only complete.
please call chris ford Phone #: ###-#### Inspection requested via web by Jessia Maxwell
|
INSP-Final Inspection | 1/8/2019 | 1/9/2019 | 1/8/2019 | P | CANC |
Jim Page
|
|
|
please call Chris ford Phone #: ###-#### >> Inspection requested via web by Jessia Maxwell Inspection cancelled from web by: Jessia Maxwell
|
INSP-Final Inspection | 1/4/2019 | 1/8/2019 | 1/8/2019 | P | FAIL |
Jim Page
|
|
|
Flow switches on levels 1 and 2 go instantly to alarm with water flow, flow switches will need to be replaced. Basement level flow switch would not trip with a consistant time, recommend replacement of switch for basement level. PIV took 12 turns to report to panel, needs to be 2 1/2 turns or less.
Please call chris ford Phone #: ###-#### Inspection requested via web by Jessia Maxwell
|
INSP-Final Inspection | 1/4/2019 | 1/7/2019 | 1/4/2019 | P | CANC |
Jim Page
|
|
|
please call chris ford Phone #: ###-#### >> Inspection requested via web by Jessia Maxwell Inspection cancelled from web by: Jessia Maxwell
|
INSP-Final Inspection | 11/14/2018 | 11/15/2018 | 11/14/2018 | P | CANC |
Jim Page
|
|
|
Please call Chris Ford Phone #: ###-#### >> Inspection requested via web by Jessia Maxwell Inspection cancelled from web by: Jessia Maxwell
|
INSP-Sprinkler Rough-in | 10/25/2018 | 10/25/2018 | 10/25/2018 | P | PASS |
Jim Page
|
|
|
Core and shell fire sprinkler protection rough in inspection complete, overhead fire sprinkler piping above hardlid areas approved for cover.
|
INSP-Sprinkler Rough-in/Hydro | 10/24/2018 | 10/25/2018 | 10/25/2018 | P | DONE |
Jim Page
|
|
|
Hydrostatic test for overhead fire sprinkler piping, remote FDC and undergorund supply complete, no pressure loss observed.
Phone #: ###-#### Inspection requested via web by Jessia Maxwell
|
INSP-Final Inspection | 10/23/2018 | 10/24/2018 | 10/24/2018 | P | FAIL |
Jim Page
|
|
|
Need to re-hydro overhead fire sprinkler piping due to past freeze issues. Cannot find notes on underground and remote FDC hydro, need to perform hydrostatic test on all associated fire sprinkler componenets before final can be completed. Make corrections in discussed locations.
Can we please have the fire alarm inspection as well FIr18-00777. this permit is not showing up online Phone #: ###-#### Inspection requested via web by Jessia Maxwell
|
INSP-Final Inspection | 10/23/2018 | 10/24/2018 | 10/23/2018 | A | CANC |
Jim Page
|
|
|
Can we please have the fire alarm inspection as well FIr18-00777. this permit is not showing up online Phone #: ###-#### >> Inspection requested via web by Jessia Maxwell Inspection cancelled from web by: Jessia Maxwell
|
INSP-Final Inspection | 10/23/2018 | 10/25/2018 | 10/23/2018 | A | CANC |
Jim Page
|
|
|
Phone #: ###-#### >> Inspection requested via web by Jessia Maxwell Inspection cancelled from web by: Jessia Maxwell
|