INSP-Final Inspection | 10/8/2018 | 10/9/2018 | 10/9/2018 | A | PASS |
Jim Page
|
|
|
Final underground supply inspection complete.
Rick Fry Phone #: ###-#### Inspection requested via web by Nathan Stenquist
|
INSP-Sprinkler Rough-in/Hydro | 9/26/2018 | 9/26/2018 | 9/26/2018 | P | DONE |
Jim Page
|
|
|
Hydrostatic test for underground supply complete.
HYDRO UG / FINAL BF ROY Phone #: ###-#### Inspection requested via web by Nathan Stenquist
|
INSP-Supply line flush | 9/25/2018 | 9/25/2018 | 9/25/2018 | P | DONE |
Jim Page
|
|
|
Underground main line flush complete.
UG Flush and Cover Roy Phone #: ###-#### Inspection requested via web by Nathan Stenquist
|
INSP-Sprinkler Rough-in | 9/24/2018 | 9/24/2018 | 9/24/2018 | P | PASS |
Jim Page
|
|
|
Rough to cover inspection for underground supply complete, approved for cover.
UG Cover Troy Phone #: ###-#### Inspection requested via web by Nathan Stenquist
|
INSP-Sprinkler Rough-in | 9/20/2018 | 9/20/2018 | 9/20/2018 | P | NR |
Mike Jordan
|
|
|
UG COVER INSP. ROY Phone #: ###-#### Inspection requested via web by Nathan Stenquist. Trench being excavated and lined with sand. Will need to recall when ready.
|