INSP-Final Inspection | 1/18/2019 | 1/18/2019 | 1/18/2019 | P | PASS |
Jim Page
|
|
|
Final fire sprinkler inspection complete.
Phone #: ###-#### Inspection requested via web by Sam Ball
|
INSP-Supply line flush | 12/11/2018 | 12/12/2018 | 12/12/2018 | P | PASS |
Troy Cobbley
|
|
|
Underground flush passed. Flow was not as expected so Suez is going to follow up that the flow is as provided for design.
Set up for 1:00 pm Phone #: ###-#### Inspection requested via web by Sam Ball
|
INSP-Supply line flush | 12/11/2018 | 12/12/2018 | 12/11/2018 | A | CANC |
Jim Page
|
|
|
Phone #: ###-#### >> Inspection requested via web by Sam Ball Inspection cancelled from web by: Sam Ball
|
INSP-Sprinkler Rough-in | 10/30/2018 | 10/30/2018 | 10/30/2018 | P | PASS |
Jim Page
|
|
|
Rough to cover inspection for underground supply complete, approved for cover.
Underground cover inspection. Phone #: ###-#### Inspection requested via web by Sam Ball
|
INSP-Sprinkler Rough-in | 10/18/2018 | 10/19/2018 | 10/19/2018 | P | PASS |
Jim Page
|
|
|
Rough to cover inspection for overhead fire sprinkler piping/tenting complete, approved for cover.
Renting and rough to cover Phone #: ###-#### Inspection requested via web by Sam Ball
|