Information based on query as of Wednesday, July 24, 2024.
Permit Information
Permit NumberFIR18-00818
StatusFinaled
Name ABSOLUTE FIRE PROTECTION
Site Address 950 W BANNOCK ST Unit: 430
Project NameBanner 430- Milliman TI
Customer Number 
ePlanReviewYes
Description
[Banner 430 - Milliman TI] - Quick Permit
Add 5 SSP and relocate 12 SSP all on flexhead for new wall layout

[BLD18-03677]
Permit for tenant improvements to an existing 3,838 sq ft office space for a new tenant. Work to include infilling door opening into stair enclosure with 2-hr rated wall, interior NxtWall demountable nonbearing partitions, doors, glass sidelights, millwork, minor electrical, plumbing, and mechanical, and interior finishes in compliance with Ch. 8 of the 2015 IBC. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. The existing common core area is required to be maintained and no alterations to the common core area are allowed under this permit. The fire sprinkler system is used for high rise and for story increase.The fire sprinkler system is required to comply with NFPA 13 and the fire alarm system is required to comply with NFPA 72 as regulated by the Fire Department. Separate fire sprinkler permits and fire alarm permits shall be obtained prior to beginning any modification or installation work on such systems. *
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection12/31/20181/2/20191/2/2019APASS
DetailsJim Page
Final fire sprinkler inspection for area of work complete.

Plans are on site Phone #: ###-#### Inspection requested via web by Sam Ball