Permit NumberFIR18-00845
StatusFinaled
Name SHILO AUTOMATIC SPRINKLER CO
Site Address 2087 S HUDSON AVE
Project NameSKYLINE APARTMENTS BLDG K
Customer Number 
ePlanReviewYes
Description
Scope of Work:
[Skyline Apartments Building K]
The fire sprinkler scope of work consists of installing a new fire sprinkler system into a new three-level apartment building per NFPA 13R, 2016, and the City of Boise. The system has floor control valves, residential sprinklers and CPVC piping.

• The underground piping is under permit FIR18-00608

[BLD17-04631]
Building K: (SKYLINE APARTMENTS- BUILDING TYPE 5, Building K) (24 Units) PLAN MOD RELOCATE WASHER/DRYER FROM BATHROOM TO HALLWAY ADD CLOSED DOOR AS NOTED ON APPROVED PLANS 7-2-18**AJS**The NFPA 13-R fire sprinkler system is used for occupancy and for story increase. The Maximum Allowable Area Allowed was calculated for this building being the largest in the project. To construct a 30,498 square foot three story VB Type of Construction apartment building (10,184 sq. ft. 1st story 10,157 sq. ft. 2nd story 10,157 sq. ft. 3rd story. Work is to include concrete footings, concrete foundations, concrete slabs on grade, wood stud bearing walls, wood stud shear walls, fiberglass shingles, 1-hr dwelling unit separations, 1-hour fire barriers for stair and breezeways, rated doors in breezeway, interior nonbearing walls, millwork, and finishes. Special Inspection is NOT required. The roof truss design is a deferred submittal item. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. The fire sprinkler system is required to comply with NFPA 13-R as regulated by the Fire Department. Separate fire sprinkler permits shall be obtained prior to beginning any modification or installation work on such systems. **ajs**192-unit apartment project with (9) apartment buildings, clubhouse, and associated site work

Alternative Materials and Methods:
This project includes approved code alternates to the following fire protection systems and/or building life safety systems. Please review the supplemental documents attached to this building permit case for details. Fire protection “shop drawings” shall include approved code alternate design.

• There are no AMM at this time.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection9/27/20199/27/20199/27/2019APASS
DetailsJim Page
Final inspection was completed on 17SEPT2019.
INSP-Final Inspection9/12/20199/17/20199/17/2019PPASS
DetailsTroy Cobbley
Jon Beazer is the contact. Thank you for your hard work! Phone #: ###-#### >> Inspection requested via web by Stan Beus
INSP-Sprinkler Rough-in/Hydro4/26/20194/29/20194/29/2019PPASS
DetailsMark Scharfen
System passed hydro. No movemet on gagues in 2.5 hours.

Gerardo Arce is the contact for this hydro inspection. Thank you for your help. We appreciate it. Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Sprinkler Rough-in4/25/20194/26/20194/26/2019PPASS
DetailsJim Page
Rough to cover inspection for overhead fire sprinkler piping/tenting complete, all piping approved for cover.

Gerardo Arce is the contact for this inspection. He is requesting a RTC and Tinting inspection. We appreciate your help. Have a nice day. Phone #: ###-#### Inspection requested via web by Stan Beus