INSP-Final Inspection | 1/8/2020 | 1/9/2020 | 1/9/2020 | A | PASS |
Jim Page
|
|
|
Previously noted items have been corrected, final fire sprinkler inspection is complete.
Adam Phone #: ###-#### Inspection requested via web by Nathan Stenquist
|
INSP-Final Inspection | 11/19/2019 | 11/20/2019 | 11/20/2019 | P | FAIL |
Jim Page
|
|
|
Flow switch did not report to fire panel during water flow.
Tom Small Phone #: ###-#### Inspection requested via web by Nathan Stenquist
|
INSP-Final Inspection | 12/11/2018 | 12/12/2018 | 12/12/2018 | A | FAIL |
Troy Cobbley
|
|
|
Scope of work is complete but permit can not be finaled until the fire sprinkler system monitoring system has been installed and tested.
Adam Phone #: ###-####
|