INSP-Final Inspection | 5/2/2019 | 5/2/2019 | 5/2/2019 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Final Inspection | 4/29/2019 | 4/30/2019 | 4/30/2019 | A | FAIL |
Troy Cobbley
|
|
|
Permit will be ok for final when the plan mod is approved.
Roy is the contact Phone #: ###-#### Inspection requested via web by Chris Green
|
INSP-Final Inspection | 3/4/2019 | 3/5/2019 | 3/5/2019 | A | PART |
Jim Page
|
|
|
Trip test was completed with Lee Meridith, could not perform walkthrough due to time constraints. Final walk through of project will need to be completed.
Zack Grasmick is the contact. Needing a final and a trial test. Phone #: ###-#### Inspection requested via web by Chris Green
|
INSP-Sprinkler Rough-in/Hydro | 2/28/2019 | 3/1/2019 | 3/1/2019 | P | DONE |
Jim Page
|
|
|
Hydrostatic test for canopy dry system witnessed, no pressure loss observed.
zack Phone #: ###-####
|
INSP-Sprinkler Rough-in/Hydro | 2/19/2019 | 2/20/2019 | 2/20/2019 | A | CANC |
Jim Page
|
|
|
Hydrostatic test for overhead fire sprinkler piping in conapy has been cancelled, weather does not permit a hydrostatic test, temperature for hydrostaic tests needs to be maintained at 40 degrees or above for hydro to be accepted.
Zach Phone #: ###-####
|
INSP-Supply line flush | 2/19/2019 | 2/20/2019 | 2/20/2019 | A | CANC |
Jim Page
|
|
|
Inspection request was for a completion on the air test, not a main line flush, this request is cancelled.
air test // Zack Phone #: ###-####
|
INSP-Sprinkler Rough-in/Hydro | 2/20/2019 | 2/20/2019 | 2/20/2019 | A | DONE |
Jim Page
|
|
|
24 hour air test complete with no pressure loss witnessed.
|
INSP-Supply line flush | 2/19/2019 | 2/19/2019 | 2/19/2019 | P | PART |
Jim Page
|
|
|
Air test started at 9AM with 50 PSI.
air test // Zack Phone #: ###-####
|