INSP-Final Inspection | 12/18/2018 | 12/19/2018 | 12/19/2018 | P | PASS |
Jim Page
|
|
|
Final inspection for scope of work complete.
FINAL UNDERGROUND INSPECTION Phone #: ###-#### Inspection requested via web by Brad Bettencourt
|
INSP-Supply line flush | 12/18/2018 | 12/19/2018 | 12/19/2018 | P | DONE |
Jim Page
|
|
|
Undergorund supply flush complete.
FLUSH OF UNDERGROUND Phone #: ###-#### Inspection requested via web by Brad Bettencourt
|
INSP-Sprinkler Rough-in/Hydro | 12/18/2018 | 12/19/2018 | 12/19/2018 | P | DONE |
Jim Page
|
|
|
Hydrostatic test for undergorund supply witnessed, no pressure loss observed.
TROY NELSON IS OUR CONTACT. THIS IS HYDRO OF UNDERGROUND Phone #: ###-#### Inspection requested via web by Brad Bettencourt
|
INSP-Sprinkler Rough-in | 12/18/2018 | 12/19/2018 | 12/19/2018 | A | PASS |
Jim Page
|
|
|
Rough to cover inspection for underground supply re-route complete, approved for cover.
TROY NELSON IS OUR CONTACT. THI IS A COVER INSPECTION FOR UNDERGROUND Phone #: ###-#### Inspection requested via web by Brad Bettencourt
|
INSP-Sprinkler Rough-in | 12/18/2018 | 12/19/2018 | 12/18/2018 | P | CANC |
Jim Page
|
|
|
TROY NELSON IS OUR CONTACT. THIS IS JUST A UNDERGROUND COVER INSPECTION. Phone #: ###-#### >> Inspection requested via web by Brad Bettencourt Inspection cancelled from web by: Brad Bettencourt
|