INSP-Final Inspection | 4/11/2019 | 4/11/2019 | 4/11/2019 | A | PASS |
Jim Page
|
|
|
Final fire sprinkler inspection for area of work complete.
|
INSP-Sprinkler Rough-in/Hydro | 4/10/2019 | 4/11/2019 | 4/11/2019 | A | PASS |
Jim Page
|
|
|
Rough to cover inspection for area of work complete.
Wiill Phone #: ###-####
|
INSP-Sprinkler Rough-in | 1/30/2019 | 1/31/2019 | 1/31/2019 | A | PASS |
Jim Page
|
|
|
Rough to cover ispection for overhead fire sprinkler piping complete, approved for cover.
Will Phone #: ###-####
|