INSP-Final Inspection | 6/19/2019 | 6/20/2019 | 6/20/2019 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled. Boise Fire agreed to modified trip time. See email.
Contact Name is Nick Phone #: ###-#### Inspection requested via web by Chris Green
|
INSP-Final Inspection | 2/21/2019 | 2/21/2019 | 2/21/2019 | P | FAIL |
Troy Cobbley
|
|
|
Retried trip time on the dry pipe valve and it is at 2:00 minutes this time
|
INSP-Final Inspection | 2/20/2019 | 2/21/2019 | 2/21/2019 | A | FAIL |
Troy Cobbley
|
|
|
The sprinkler head under the duct work is passed but the dry system trip time failed. It was 1:47 minutes. Raul Phone #: ###-####
|
INSP-Final Inspection | 2/13/2019 | 2/14/2019 | 2/14/2019 | A | FAIL |
Troy Cobbley
|
|
|
Need to trip the dry pipe valve and possibly measure the trip time and verify quick opening device.
Nick Phone #: ###-####
|