INSP-Final Inspection | 9/30/2019 | 9/30/2019 | 9/30/2019 | P | PASS |
Jim Page
|
|
|
Final inspection for underground supply complete.
Adam Phone #: ###-####
|
INSP-Final Inspection | 9/11/2019 | 9/11/2019 | 9/11/2019 | P | CANC |
Troy Cobbley
|
|
|
Could not perform inspection due to time constraints. Please call troy with time frame. Phone #: ###-#### Inspection requested via web by Jeff Packham
|
INSP-Supply line flush | 5/21/2019 | 5/21/2019 | 5/21/2019 | A | DONE |
Jim Page
|
|
|
Underground main line flush complete.
Troy Phone #: ###-#### Inspection requested via web by Nathan Stenquist
|
INSP-Sprinkler Rough-in | 2/12/2019 | 2/12/2019 | 2/12/2019 | P | PASS |
Jim Page
|
|
|
Rough to cover inspection for undergorund supply complete, approevd for cover.
UG Cover Troy Nelson Phone #: ###-#### Inspection requested via web by Nathan Stenquist
|
INSP-Sprinkler Rough-in | 2/11/2019 | 2/11/2019 | 2/11/2019 | P | CANC |
Jim Page
|
|
|
UG Cover 2" Poly Troy Nelson Phone #: ###-#### >> Inspection requested via web by Nathan Stenquist Inspection cancelled from web by: Nathan Stenquist
|