INSP-Final Inspection | 9/25/2019 | 9/26/2019 | 9/26/2019 | A | PASS |
Jim Page
|
|
|
Final fire sprinkler inspection for area of work complete.
Don Forester Phone #: ###-#### Inspection requested via web by Brodie Stenquist
|
INSP-Sprinkler Rough-in | 8/15/2019 | 8/15/2019 | 8/15/2019 | P | PASS |
Jim Page
|
|
|
Remaining overhead fire sprinkler piping in area of work inspected, area of work approved for cover.
Don Phone #: ###-####
|
INSP-Sprinkler Rough-in | 5/15/2019 | 5/16/2019 | 5/16/2019 | A | PART |
Jim Page
|
|
|
Partial rough to cover inspection for overhead fire sprinkler piping complete, notated city approved drawings area approved for cover.
don Phone #: ###-####
|