INSP-Final Inspection | 5/29/2019 | 5/30/2019 | 5/30/2019 | A | PASS |
Jim Page
|
|
|
Final fire sprinkler ispection for area of work complete.
Plans are with Eric Phone #: ###-#### Inspection requested via web by Sam Ball
|
INSP-Sprinkler Rough-in | 5/7/2019 | 5/8/2019 | 5/8/2019 | A | PASS |
Troy Cobbley
|
|
|
The remaining sprinkler piping is ok for cover.
Phone #: ###-#### Inspection requested via web by Sam Ball
|
INSP-Sprinkler Rough-in | 5/3/2019 | 5/3/2019 | 5/3/2019 | P | PASS |
Troy Cobbley
|
|
|
***Rough inspection pass. No hydro.**MAS***
The space is in the basement east of the elevator plans are on supervisors desk. Phone #: ###-#### >> Inspection requested via web by Sam Ball
|
INSP-Sprinkler Rough-in | 4/19/2019 | 4/22/2019 | 4/22/2019 | A | PART |
Jim Page
|
|
|
Partial rough to cover inspection for overhead fire sprinkler piping in area of work complete, grid installed on southside of tenant space approved for cover, total of 3 branch lines.
Parcel rough in Phone #: ###-#### Inspection requested via web by Sam Ball
|
INSP-Sprinkler Rough-in | 3/25/2019 | 3/25/2019 | 3/25/2019 | P | PART |
Jim Page
|
|
|
Rough to cover inspection for overhead firte sprinkler piping above two restroom hardlids in area of work complete, restroom hardlids approved for cover.
2 hard kids. Phone #: ###-#### Inspection requested via web by Sam Ball
|