INSP-Final Inspection | 8/21/2019 | 8/21/2019 | 8/21/2019 | P | PASS |
Jim Page
|
|
|
Final fire sprinkler inspection complete.
John Phone #: ###-####
|
INSP-Sprinkler Rough-in/Hydro | 8/21/2019 | 8/21/2019 | 8/21/2019 | P | DONE |
Jim Page
|
|
|
Hydrostatic test for overhead fire sprinkler piping has been witnessed at static pressure, no pressure loss was observed.
|
INSP-Final Inspection | 8/19/2019 | 8/20/2019 | 8/20/2019 | P | CANC |
Jim Page
|
|
|
Phone #: ###-#### >> Inspection requested via web by Jonathan LaFond
|
INSP-Sprinkler Rough-in | 4/23/2019 | 4/24/2019 | 4/24/2019 | A | PASS |
Jim Page
|
|
|
Tenting inspection complete, overhead fire sprinkler piping approved for cover.
john Phone #: ###-####
|
INSP-Sprinkler Rough-in | 4/12/2019 | 4/15/2019 | 4/15/2019 | P | PART |
Jim Page
|
|
|
Partial rough to cover inspection for overhead fire sprinkler piping complete, piping between conditioned spaces approved for cover, piping in attic spaces to have tenting inspection completed at a later date.
Dillon Phone #: ###-####
|