INSP-Final Inspection | 8/7/2019 | 8/8/2019 | 8/8/2019 | A | PASS |
Jim Page
|
|
|
Final fire sprinkler inspection complete.
Josh Eaton is the contact. He was already arranged a time with Jim Page. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
|
INSP-Sprinkler Rough-in/Hydro | 8/6/2019 | 8/7/2019 | 8/7/2019 | P | DONE |
Jim Page
|
|
|
Hydrostatic test for overhead fire sprinkler piping has been witnessed at city pressure, no pressure loss observed.
Josh Eaton is the contact. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
|
INSP-Sprinkler Rough-in | 5/22/2019 | 5/23/2019 | 5/23/2019 | P | PASS |
Jim Page
|
|
|
Rough to cover inspection for overhead fire sprinkler piping complete. All tenting insualtion in place at time of inspection, cover is approved.
Josh Eaton is the contact. He requests that he be contacted ahead of time so him and the inspector can schedule a time to meet at the job site. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
|