INSP-Final Inspection | 12/22/2019 | 12/23/2019 | 12/23/2019 | A | PASS |
Jim Page
|
|
|
Previously noted items have been corrected, final fire sprinkler inspection is complete.
All comments from the failed final have been corrected. Rick Fouts will be coming from the office, if possible, please contact him 1 hour prior to heading to the job site to allow for time to get to the site at Phone #: ###-#### Inspection requested via web by Matt Barnard
|
INSP-Final Inspection | 12/16/2019 | 12/17/2019 | 12/17/2019 | P | FAIL |
Jim Page
|
|
|
Chute room on level 3 is also a furnace closet, sprinkler head must be provided in mechanical closets. 4 sprinkler heads are less than 24 inches from heat registers, sprinklers must be 24 inches or greater away from heat registers per 2016 NFPA 13D. Repair holes around sprinkler heads where escutcheon does not cover entire penetration. Install escutcheons that are missing as discussed and replaced escutcheon in master bathroom.
Please call before heading to job site. We will be coming from the office and will need about 30 to 45 minutes to get to the job site. Phone #: ###-#### Inspection requested via web by Matt Barnard
|
INSP-Sprinkler Rough-in/Hydro | 5/22/2019 | 5/22/2019 | 5/22/2019 | P | DONE |
Jim Page
|
|
|
Hydrostatic test for overhead fire sprinkler piping witnessed with static city pressure per NFPA 13D, no pressure loss observed and no visible leakage from fire sprinkler piping.
|
INSP-Sprinkler Rough-in | 5/22/2019 | 5/22/2019 | 5/22/2019 | P | PASS |
Jim Page
|
|
|
Pastic sheeting used for tenting, all tenting in place at time of inspection, cover is approved for overhead fire sprinkler piping, cover approval sticker placed on riser.
Contact Heath Day at ###-#### Phone #: ###-#### Inspection requested via web by Matt Barnard
|
INSP-Sprinkler Rough-in | 5/20/2019 | 5/20/2019 | 5/20/2019 | A | PART |
Jim Page
|
|
|
Rough in inspection for overhead fire sprinkler piping complete, overhead fire sprinkler piping located between conditioned spaces approved for cover, piping requiring tenting to be inspected at a later date. Piping requiring tenting not approved for cover.
|
INSP-Sprinkler Rough-in | 5/17/2019 | 5/20/2019 | 5/20/2019 | A | PASS |
Jim Page
|
|
|
Rough to cover inspection for underground supply complete, approved for cover.
On Site Contact Heath Day ###-#### Phone #: ###-#### Inspection requested via web by Matt Barnard
|
INSP-Supply line flush | 5/17/2019 | 5/20/2019 | 5/20/2019 | A | DONE |
Jim Page
|
|
|
Underground main line flush complete.
On Site Contact Heath Day at ###-#### Phone #: ###-#### Inspection requested via web by Matt Barnard
|
INSP-Supply line flush | 5/17/2019 | 5/17/2019 | 5/17/2019 | P | CANC |
Jim Page
|
|
|
Contact Heath Day at ###-#### Phone #: ###-#### >> Inspection requested via web by Matt Barnard Inspection cancelled from web by: Matt Barnard
|