INSP-Final Inspection | 6/13/2019 | 6/17/2019 | 6/17/2019 | A | PASS |
Jim Page
|
|
|
Final inspection for scope of work complete.
Nate Phone #: ###-####
|
INSP-Final Inspection | 5/10/2019 | 5/13/2019 | 5/13/2019 | A | CANC |
Troy Cobbley
|
|
|
Cancel per Nate Phone #: ###-####
|
INSP-Final Inspection | 5/9/2019 | 5/10/2019 | 5/10/2019 | A | FAIL |
Troy Cobbley
|
|
|
The contractor and I could not gain access to the business. No testing performed. Nate Phone #: ###-####
|
INSP-Final Inspection | 5/8/2019 | 5/9/2019 | 5/9/2019 | A | CANC |
Troy Cobbley
|
|
|
Nate Phone #: ###-#### cancel per Nate
|
INSP-Final Inspection | 5/7/2019 | 5/8/2019 | 5/8/2019 | A | CANC |
Troy Cobbley
|
|
|
nate Phone #: ###-####
|