INSP-Final Inspection | 12/10/2019 | 12/11/2019 | 12/11/2019 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled.
Todd is the contact. Thanks for all yo do! Phone #: ###-#### Inspection requested via web by Stan Beus
|
INSP-Final Inspection | 12/9/2019 | 12/10/2019 | 12/10/2019 | P | FAIL |
Troy Cobbley
|
|
|
Forward flush passed but unable to verify signals due to fire alarm issue.
Todd is the contact Thanks for all yo do! Phone #: ###-#### Inspection requested via web by Stan Beus
|
INSP-Sprinkler Rough-in/Hydro | 12/3/2019 | 12/3/2019 | 12/3/2019 | P | PASS |
Troy Cobbley
|
|
|
Overhead hydro passed and pendants have been modified in the second open office.
Todd Ketterling is the contact. Thanks for all you do! Phone #: ###-#### Inspection requested via web by Stan Beus
|
INSP-Sprinkler Rough-in/Hydro | 11/26/2019 | 12/2/2019 | 12/2/2019 | A | PART |
Troy Cobbley
|
|
|
The sprinkler piping above the "clouds", in the second floor open area is ok for cover however it appears one pendant may need to be added due to 18' spacing on the current pendants. Also it does not appear the latest approved plans are on site since the changes in pipe routing are not shown.
Cole Bierman is the contact for this RTC and Hydro Inspection. He is hoping for an AM appointment. Thank you for your help. Have a nice day. Phone #: ###-#### Inspection requested via web by Stan Beus
|
INSP-Sprinkler Rough-in/Hydro | 11/20/2019 | 11/21/2019 | 11/21/2019 | A | PASS |
Troy Cobbley
|
|
|
First floor hydro test witnessed. Second floor piping ok to cover as marked.
Cole Bierman is the contact for this RTC/ Hydro Inspection. He is hoping for an hour notice of when appointment will be. Thank you for your help. We appreciate you. Phone #: ###-#### Inspection requested via web by Stan Beus
|
INSP-Sprinkler Rough-in/Hydro | 11/15/2019 | 11/18/2019 | 11/18/2019 | A | PASS |
Troy Cobbley
|
|
|
All sprinkler piping on the first floor is ok for cover. Not ready for hydro today.
Cole is the field contact. Thanks for all you do! Phone #: ###-#### Inspection requested via web by Stan Beus
|
INSP-Sprinkler Rough-in | 9/10/2019 | 9/11/2019 | 9/11/2019 | P | PART |
Troy Cobbley
|
|
|
Todays inspection was for a general rough-in. Piping for ceiling drops and overhead doors not installed yet and will require a separate inspection prior to cover. I noted several small deficiencies as noted on plans but mostly the rough-in is fine. Plan modifications are required showing the main piping routing changes which is to include the additional fitings and elevation changes.
Todd Ketterling is the contact. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
|
INSP-Sprinkler Rough-in | 9/10/2019 | 9/10/2019 | 9/10/2019 | P | PASS |
Troy Cobbley
|
|
|
See the city approved plans for piping above the hardlids on first and second floors where piping is ok to cover. Todd Ketterling is the contact. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
|
INSP-Sprinkler Rough-in | 8/8/2019 | 8/9/2019 | 8/9/2019 | A | PART |
Jim Page
|
|
|
Inspection for preset hangers complete, verified back nuts are in place with sammy attachments, preset hangers approved for cover.
Todd Ketterling is the contact. He would like a hanger inspection. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
|