INSP-Final Inspection | 7/29/2019 | 7/30/2019 | 7/30/2019 | A | PASS |
Troy Cobbley
|
|
|
permit finaled
Phone #: ###-#### Inspection requested via web by Sam Ball
|
INSP-Sprinkler Rough-in | 6/19/2019 | 6/19/2019 | 6/19/2019 | P | PASS |
Troy Cobbley
|
|
|
The work at the remaining pendants is complete. Piping can be covered.
Look at the rest of the heads around the bathrooms. Phone #: ###-#### Inspection requested via web by Sam Ball
|
INSP-Sprinkler Rough-in | 6/7/2019 | 6/10/2019 | 6/10/2019 | P | PASS |
Troy Cobbley
|
|
|
3 heads in hardlids for bathrooms are ok for cover on the second floor.. Phone #: ###-#### Inspection requested via web by Sam Ball
|