INSP-Final Inspection | 10/29/2019 | 10/30/2019 | 10/30/2019 | A | FAIL |
Jim Page
|
|
|
Provide annual inspection for backflow assembly. Repair visible leak at bottom of backflow.
Bobbie Silva is the contact. Thanks for all you do! Phone #: ###-#### Inspection requested via web by Stan Beus
|
INSP-Final Inspection | 10/18/2019 | 10/21/2019 | 10/21/2019 | P | FAIL |
Troy Cobbley
|
|
|
Water has not been piped to the riser.
Jon Beazer is the contact. Thanks for all you do! Phone #: ###-#### Inspection requested via web by Stan Beus
|
INSP-Final Inspection | 10/17/2019 | 10/18/2019 | 10/18/2019 | A | CANC |
Troy Cobbley
|
|
|
Cancel per Jon Beazer since he can not be there when I can be there. . We appreciate your help. Thank you. Phone #: ###-#### Inspection requested via web by Stan Beus
|
INSP-Sprinkler Rough-in | 7/3/2019 | 7/3/2019 | 7/3/2019 | A | PASS |
Jim Page
|
|
|
Rough to cover ispection for overhead fire sprinkler piping complete, all tenting in place at time of insulation, approved for cover.
|
INSP-Sprinkler Rough-in/Hydro | 7/2/2019 | 7/3/2019 | 7/3/2019 | A | DONE |
Jim Page
|
|
|
Hydrostatic test for overhead fire sprinkler piping witnessed at 150PSI, above what is required by 13D, no pressure loss observed.
Gabe Garduno is the contact. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
|