INSP-Final Inspection | 8/29/2019 | 8/29/2019 | 8/29/2019 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled. Asbuilts approved, Troy said he would approve once as builts were approved. No inspection needed Phone #: ###-#### Inspection requested via web by Kristin Dolan
|
INSP-Final Inspection | 8/26/2019 | 8/27/2019 | 8/27/2019 | A | CANC |
Troy Cobbley
|
|
|
Waiting for plan review approval of the as-builts. Brandon Phone #: ###-####
|
INSP-Final Inspection | 8/21/2019 | 8/22/2019 | 8/22/2019 | P | FAIL |
Troy Cobbley
|
|
|
Need battery installed in the dialer, need loss of battery to report as trouble, need the tamper signals to report to central station.
Call ahead to Brandon @ ###-#### Phone #: ###-#### Inspection requested via web by Kristin Dolan (change inspection to this afternoon, 8-22, per kristin dolan)
|
INSP-Final Inspection | 8/12/2019 | 8/12/2019 | 8/12/2019 | P | CANC |
Troy Cobbley
|
|
|
Phone #: ###-#### >> Inspection requested via web by Kristin Dolan Inspection cancelled from web by: Kristin Dolan
|