DOC - Permit Finaled | | | 8/23/2019 | | PASS |
Mark Scharfen
|
|
|
As built uploaded and signed off. Permit can be finaled.
|
INSP-Final Inspection | 8/14/2019 | 8/16/2019 | 8/16/2019 | P | PART |
Mark Scharfen
|
|
|
NETCON good. Verified signals. Passed pending asbuilt showing AES trouble connection to Zone 10 on FACP,
Please call Nate at ###-#### with inspection time. Phone #: ###-#### Inspection requested via web by Lori Brungardt
|
INSP-Final Inspection | 8/12/2019 | 8/13/2019 | 8/13/2019 | P | FAIL |
Troy Cobbley
|
|
|
Called and left two messages on contacts voice mail. I went to project site by no one was there. Riser room door is locked. No inspection performed. Please call Nate at ###-#### with inspection time. Phone #: ###-#### Inspection requested via web by Lori Brungardt
|
INSP-Final Inspection | 7/29/2019 | 7/31/2019 | 7/31/2019 | P | CANC |
Troy Cobbley
|
|
|
To be rescheduled per contact.
Phone #: ###-#### Inspection requested via web by Nathan Schneider
|