INSP-Final Inspection | 9/3/2019 | 9/3/2019 | 9/3/2019 | P | PASS |
Jim Page
|
|
|
Final fire sprinkler inspection for area of work complete.
|
INSP-Sprinkler Rough-in | 9/3/2019 | 9/3/2019 | 9/3/2019 | P | CANC |
Jim Page
|
|
|
Inspection request was a final, this request is cancelled.
Mike Phone #: ###-####
|
INSP-Sprinkler Rough-in | 8/20/2019 | 8/20/2019 | 8/20/2019 | P | PASS |
Jim Page
|
|
|
Rough to cover inspection for overhead fire sprinkler piping in area of work complete, approved for cover.
Mike Phone #: ###-####
|
INSP-Sprinkler Rough-in | 7/24/2019 | 7/24/2019 | 7/24/2019 | P | PART |
Jim Page
|
|
|
Rough to cover inspection for overhead fire sprinkler piping above hardlids in area of work complete, hardlids approved for cover.
Mike Phone #: ###-####
|