INSP-Sprinkler Rough-in/Hydro | 10/24/2019 | 10/25/2019 | 10/25/2019 | A | DONE |
Jim Page
|
|
|
24 hour air test is complete.
Please call Roy for inspection time.24 hour test Phone #: ###-#### Inspection requested via web by Daniel Buccino
|
INSP-Sprinkler Rough-in | 10/23/2019 | 10/24/2019 | 10/24/2019 | A | PASS |
Troy Cobbley
|
|
|
Rough-in for overhead piping passed. 24 hour air test started at 8:00am with 46psi on guage. Plan mods needed to show pipe routing changes and additional fittings.
Please Call Roy Nelson for early AM inspection if possible. Phone #: ###-#### Inspection requested via web by Daniel Buccino
|