INSP-Final Inspection | 10/30/2019 | 10/31/2019 | 10/31/2019 | A | PASS |
Jim Page
|
|
|
Final fire sprinkler inspection for scope of work is complete.
Call for access- Rick Phone #: ###-####
|
INSP-Sprinkler Rough-in | 10/28/2019 | 10/28/2019 | 10/28/2019 | P | PASS |
Jim Page
|
|
|
Rough to cover inspection for remaining overhead fire sprinkler piping in area of work complete, approved for cover.
Phone #: ###-#### Inspection requested via web by Matthew Lewis
|
INSP-Sprinkler Rough-in | 10/4/2019 | 10/4/2019 | 10/4/2019 | P | PART |
Jim Page
|
|
|
Rough to cover inspection for overhead fire sprinkler piping above hardlids in area of work complete, hardlids approved for cover.
Hard lid cover inspection please call Tom Small with time frame. Phone #: ###-#### Inspection requested via web by Jeff Packham
|
INSP-Sprinkler Rough-in | 8/21/2019 | 8/22/2019 | 8/22/2019 | A | PART |
Jim Page
|
|
|
Rough to cover ispection for overhead fire sprinkler piping located above hardlids in area of work complete, hardlids approved for cover.
John Phone #: ###-####
|