Permit Number | FIR19-00590 |
Status | Finaled |
Name |
APEX INTEGRATED SECURITY SOLUTIONS
|
Site Address |
880 W RIVER ST
|
Project Name | The Afton Heat-Trace Monitorin |
Customer Number | |
ePlanReview | Yes |
Description |
The Afton Heat-Trace Monitoring consist on Install new Heat-Trace System on exposed sprinkler pipes running on the 5th floor top of elevator shaft. Install new C910 Heat-Trace Controller power 120VAC. Add (3) monitor modules to monitor ground fault, power loss & high/low pipe temperature. All new devices to be tie to existing FA System. This work is associated with BLD18-00444.
|