INSP-Final Inspection | 10/30/2019 | 10/31/2019 | 10/31/2019 | P | PASS |
Jim Page
|
|
|
Final fire sprinkler inspection for this scope of work is complete.
George id the field contact. Thanks for all you do! Phone #: ###-#### Inspection requested via web by Stan Beus
|
INSP-Sprinkler Rough-in | 10/24/2019 | 10/24/2019 | 10/24/2019 | P | PASS |
Jim Page
|
|
|
Rough to cover inspection for overhead fire sprinkler piping above suspended ceiling is complete, approved for cover. Will verify roof top sprinklers on the east side of open ceiling rooms at a later date, 4 more needed to be re-installed per approved plans. Sidewalls from old roll up doors above ceiling grid to be removed, will verify during a later inspection.
|
INSP-Sprinkler Rough-in | 10/22/2019 | 10/23/2019 | 10/23/2019 | A | FAIL |
Troy Cobbley
|
|
|
Resubmit plan mods showing the use of the flex heads. Also provide verification of the upright coverage around the rooms with no ceilings.. No piping can be covered.
George Jess Field Contact. Thanks for all you do! Phone #: ###-#### Inspection requested via web by Stan Beus
|
INSP-Final Inspection | 10/22/2019 | 10/23/2019 | 10/23/2019 | A | CANC |
Troy Cobbley
|
|
|
Not ready for a final.
George Jess is field contact. Thanks for all you do! Phone #: ###-#### Inspection requested via web by Stan Beus
|
INSP-Sprinkler Rough-in/Hydro | 10/16/2019 | 10/17/2019 | 10/17/2019 | A | PASS |
Troy Cobbley
|
|
|
*** PASS Hydro Only - No rough inspection done at this time. MAS***
George Jess is the contact for this overhead hydro. We appreciate your help. Thank you. Phone #: ###-#### >> Inspection requested via web by Stan Beus
|
INSP-Sprinkler Rough-in | 10/1/2019 | 10/2/2019 | 10/2/2019 | P | PART |
Jim Page
|
|
|
Rough to cover inspection for overhead fire sprinkler piping above hardlids complete, hardlids approved for cover.
Todd Ketterling is the contact. He needs at least 45 minutes heads up to meet you out there. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
|