INSP-Final Inspection | 12/10/2019 | 12/11/2019 | 12/11/2019 | P | PASS |
Jim Page
|
|
|
Previously noted items have been corrected, final fire alarm inspection is complete.
Phone #: ###-#### Inspection requested via web by Kristin Dolan
|
INSP-Final Inspection | 12/4/2019 | 12/5/2019 | 12/5/2019 | A | FAIL |
Jim Page
|
|
|
As per notes entered on 22NOV2019 conference, visual effects need to isolate during fire general fire alarm activation. Horn strobe by bar area is in different location than what is shown on the city approved drawings, A/V is a 75 candella, Horn strobe is oversapeced.
Phone #: ###-#### Inspection requested via web by Kristin Dolan
|
INSP-Final Inspection | 12/2/2019 | 12/4/2019 | 12/4/2019 | A | CANC |
Troy Cobbley
|
|
|
Not ready per contact. Call ahead to Damien ###-####8 Phone #: ###-#### Inspection requested via web by Kristin Dolan
|
INSP-Conference | 11/21/2019 | 11/22/2019 | 11/22/2019 | A | DONE |
Jim Page
|
|
|
Fire conference complete, per conversation with Lee Meridith, Fire Alarm Plan Reviewer, due to the requirement of audio and visual effect shutdown on general fire the karaoke rooms will have strobe only as shown on city approved drawings. Both visual effects and audio in karaoke rooms will need to cease during general fire alarm activation as discussed, city approved plans need to reflect the addition of required device for audio and visual effect shutdown.
Request for consult for Friday late morning. Damien will call Jim tomorrow to coordinate the time. Phone #: ###-#### Inspection requested via web by Kristin Dolan
|