INSP-Final Inspection | 11/20/2019 | 11/20/2019 | 11/20/2019 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Final Inspection | 11/13/2019 | 11/13/2019 | 11/13/2019 | P | PART |
Troy Cobbley
|
|
|
Permit will be ok to final when the knox key box has been provided as discussed.
Gary Phone #: ###-####
|
INSP-Final Inspection | 11/7/2019 | 11/8/2019 | 11/8/2019 | A | FAIL |
Troy Cobbley
|
|
|
Panel is in trouble, also the batteries do not sit in correctly due to two conduits being installed in the bottom of the fire alarm panel, There is already signs of the wires being pinched by the batteries when the door is closed. No testing done.
Gary Phone #: ###-####
|
INSP-Final Inspection | 10/25/2019 | 10/29/2019 | 10/29/2019 | P | CANC |
Troy Cobbley
|
|
|
Cancel per Burl Phone #: ###-####
|