INSP-Final Inspection | 10/2/2019 | 10/3/2019 | 10/3/2019 | A | PASS |
Jim Page
|
|
|
Final fire sprinkler inspection for area of work complete.
Jeff Phone #: ###-####
|
INSP-Sprinkler Rough-in | 10/2/2019 | 10/3/2019 | 10/3/2019 | A | PASS |
Jim Page
|
|
|
Rough to cover inspection for overhead fire sprinkler piping in area of work complete, approved for cover.
Jeff Phone #: ###-####
|