INSP-Final Inspection | 11/22/2019 | 11/25/2019 | 11/25/2019 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled. Phone #: ###-#### Inspection requested via web by Sam Ball
|
INSP-Final Inspection | 10/3/2019 | 10/4/2019 | 10/4/2019 | A | CANC |
Troy Cobbley
|
|
|
Not ready for final due to insulation blocking upright sprinkler heads. Phone #: ###-#### Inspection requested via web by Sam Ball
|
INSP-Sprinkler Rough-in | 10/3/2019 | 10/4/2019 | 10/4/2019 | A | PASS |
Troy Cobbley
|
|
|
Rough-in passed. Can not final until the insulation that is falling from the deck has been repaired. Phone #: ###-#### Inspection requested via web by Sam Ball
|