INSP-Final Inspection | 5/6/2020 | 5/6/2020 | 5/6/2020 | P | PASS |
Jim Page
|
|
|
Final fire sprinkler inspection complete.
Rick Fry Phone #: ###-#### Inspection requested via web by Brodie Stenquist
|
INSP-Final Inspection | 3/19/2020 | 3/19/2020 | 3/19/2020 | P | PART |
Jim Page
|
|
|
Final fire sprinkler inspection for TCO phase 1 complete.
|
INSP-Sprinkler Rough-in | 3/19/2020 | 3/19/2020 | 3/19/2020 | P | CANC |
Jim Page
|
|
|
Inspection was for TCO phase 1 final inspection, this request is cancelled.
Rick Phone #: ###-####
|
INSP-Sprinkler Rough-in | 1/20/2020 | 1/21/2020 | 1/21/2020 | A | PART |
Jim Page
|
|
|
Rough to cover inspection for overhead fire sprinkler piping above ceiling grid complete, approved for cover.
rick fry Phone #: ###-#### Inspection requested via web by Brodie Stenquist
|
INSP-Sprinkler Rough-in | 12/20/2019 | 12/23/2019 | 12/23/2019 | A | PART |
Jim Page
|
|
|
Notated city approved drawings areas approved for cover.
Adam Phone #: ###-####
|
INSP-Sprinkler Rough-in | 10/28/2019 | 10/29/2019 | 10/29/2019 | A | PART |
Jim Page
|
|
|
Rough to cover inspection for overhead fire sprinkler piping above hardlids complete, hardlids approved for cover, areas approved for cover have been notated with red ink on city approved drawings on site.
Rick Phone #: ###-####
|