INSP-Final Inspection | 12/4/2019 | 12/4/2019 | 12/4/2019 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled.
Phone #: ###-#### Inspection requested via web by Jonathan LaFond
|
INSP-Sprinkler Rough-in | 11/12/2019 | 11/13/2019 | 11/13/2019 | A | PASS |
Troy Cobbley
|
|
|
Rough-in passed for the west side of the tenant space. Piping can be covered.
Peyton Nelson Phone #: ###-####
|
INSP-Sprinkler Rough-in | 11/8/2019 | 11/12/2019 | 11/12/2019 | A | PASS |
Troy Cobbley
|
|
|
Rough-in passed for the original scope of work. Piping can be covered.
Phone #: ###-#### Inspection requested via web by Jonathan LaFond
|
INSP-Sprinkler Rough-in | 11/8/2019 | 11/8/2019 | 11/8/2019 | P | FAIL |
Troy Cobbley
|
|
|
The area that was requested to be inspected is not shown on the city approved plan. Plan mods are needed showing all of the scope of work or another permit. No piping can be covered.
Inspection for west side of space. Phone #: ###-#### Inspection requested via web by Jonathan LaFond
|