INSP-Supply line flush | 6/5/2020 | 6/5/2020 | 6/5/2020 | P | PASS |
Troy Cobbley
|
|
|
The underground supply line flush witnessed.
Tanner *screened* Phone #: ###-####
|
INSP-Sprinkler Rough-in/Hydro | 1/15/2020 | 1/16/2020 | 1/16/2020 | P | PASS |
Troy Cobbley
|
|
|
Underground supply piping hydro test witnessed.
bld A // Kyle Phone #: ###-####
|
INSP-Sprinkler Rough-in | 1/8/2020 | 1/8/2020 | 1/8/2020 | P | PASS |
Jim Page
|
|
|
Rough to cover inspection for undergorund supply complete, approved for cover.
Kyle Phone #: ###-####
|