INSP-Sprinkler Rough-in/Hydro | 6/4/2020 | 6/5/2020 | 6/5/2020 | A | CANC |
Troy Cobbley
|
|
|
Wrong inspection type called in, needed a flush.
Tanner Phone #: ###-####
|
INSP-Supply line flush | 6/5/2020 | 6/5/2020 | 6/5/2020 | P | PASS |
Troy Cobbley
|
|
|
Underground supply line flush witnessed.
Tanner *screened* Phone #: ###-####
|
INSP-Sprinkler Rough-in/Hydro | 1/15/2020 | 1/16/2020 | 1/16/2020 | P | PASS |
Troy Cobbley
|
|
|
Underground supply piping hydro test witnessed.
bld L // Kyle Phone #: ###-####
|
INSP-Sprinkler Rough-in | 1/8/2020 | 1/9/2020 | 1/9/2020 | A | PASS |
Troy Cobbley
|
|
|
Underground supply piping is ok for cover.
KYLE Phone #: ###-####
|
INSP-Sprinkler Rough-in | 1/8/2020 | 1/8/2020 | 1/8/2020 | P | PART |
Jim Page
|
|
|
Partial cover inspection for underground supply complete. 45 degree fittings were added around another buried pipe, need an approved protective coating to be added to the rebar used for the deadman thrust blocks. Cover is approved west of the 45 degree fittings, a follow up inspection will be required for coating of rebar before cover can be approved.
which required a dead man thrust Kyle Phone #: ###-####
|