INSP-Final Inspection | 5/28/2020 | 5/28/2020 | 5/28/2020 | P | PASS |
Troy Cobbley
|
|
|
Both Hydro for UG and Flush witnessed.
#: ###-#### Inspection requested via web by Jeff Packham
|
INSP-Supply line flush | 2/4/2020 | 2/6/2020 | 2/6/2020 | A | CANC |
Troy Cobbley
|
|
|
troy nelson Phone #: ###-#### Inspection requested via web by Brodie Stenquist
|
INSP-Supply line flush | 11/20/2019 | 11/20/2019 | 11/20/2019 | P | PASS |
Troy Cobbley
|
|
|
IBR/Stub out is ok for cover. No other underground piping installed yet.
U.G. cover Troy Nelson Phone #: ###-#### Inspection requested via web by Brodie Stenquist
|
INSP-Supply line flush | 11/18/2019 | 11/19/2019 | 11/19/2019 | A | CANC |
Troy Cobbley
|
|
|
Cancel per Troy. U.G. cover Troy Nelson Phone #: ###-#### Inspection requested via web by Brodie Stenquist
|